(The Gist of PIB) All modules getting ready for Chandrayaan-2 launch [MAY-2019]


    (The Gist of PIB) All modules getting ready for Chandrayaan-2 launch [MAY-2019]


All modules getting ready for Chandrayaan-2 launch

  • Chandrayaan-2, India’s second lunar mission, has three modules namely Orbiter, Lander (Vikram) and Rover (Pragyan).

Highlights of the project

  • The Orbiter and Lander modules will be interfaced mechanically and stacked together as an integrated module and accommodated inside the GSLV MK-III launch vehicle.
  • The Rover is housed inside the Lander. After launch into earth bound orbit by GSLV MK-III, the integrated module will reach Moon orbit using Orbiter propulsion module.
  • Subsequently, Lander will separate from the Orbiter and soft land at the predetermined site close to the lunar South Pole.
  • Further, the Rover will roll out for carrying out scientific experiments on the lunar surface. Instruments are also mounted on the Lander and Orbiter for carrying out scientific experiments.
  • All the modules are getting ready for Chandrayaan-2 launch during the window of July 09 to July 16, 2019, with an expected Moon landing on September 06, 2019.

Study Material for UPSC General Studies Pre Cum Mains

This is Only Sample Material, To Get Full Materials Buy The Gist 1 Year Subscription - "Only PDF" Click Here

Click Here to Download More Free Sample Material

<<Go Back To Main Page

Courtesy: PIB