(THE GIST OF PIB) Battery Energy Storage System

(THE GIST OF PIB) Battery Energy Storage System

[November-2021]

Battery Energy Storage System

  • Government has given go-ahead for inviting the expression of interest for installation of 1000 MWh Battery Energy Storage System (BESS) as a pilot project.

About:

  • This is the joint effort of both Ministry of New and renewable energy and the Ministry of Power who have been working on this to provide a road map for the installation of the energy storage system in the country.
  • Solar Energy Corporation of India (SECI), a CPSU under the Ministry of New and renewable energy, has called for the expression of interest for procurement of 1000 MWh BESS.
  • This will be published along with the RFS bid document and the draft comprehensive guideline for procurement and utilization of BESS as a part of generation, transmission and distribution assets and with all ancillary services.
  • Based on the suggestions and the feedback from various stakeholders, the final RFS document will be floated in the first week of November 2021, along with the final comprehensive guidelines for procurement and utilization of BESS as a part of generation, transmission and distribution assets and with all ancillary services.

Going forward, India plans to use an energy storage system under the following business cases:

  • Renewable energy along with the energy storage system
  • Energy storage system as grid element to maximize the use of transmission system and strengthening grid stability and also to save investment in the augmentation of transmission infrastructure.
  • Storage as an asset for balancing services and flexible operation. The system operator i.e. load dispatchers (RLDCs and SLDCs) may use a storage system for frequency control and balancing services to manage the inherent uncertainty/variations in the load due to un-generation.
  • Storage for distribution system i.e., it may be placed at the load centre to manage its peak load and other obligations.
  • As a merchant capacity by the energy storage system developer and sell in the power market
  • Any other future business models as a combination of the above.

CLICK HERE TO DOWNLOAD FULL PDF

CLICK HERE TO DOWNLOAD UPSC E-BOOKS

Study Material for UPSC General Studies Pre Cum Mains

Get The Gist 1 Year Subscription Online

Click Here to Download More Free Sample Material

<<Go Back To Main Page

Courtesy: PIB