(The Gist of PIB) Draft Electricity Rules 2021

(THE GIST OF PIB) Draft Electricity Rules 2021

[September-2021]

Draft Electricity Rules 2021

  • The Ministry of Power has circulated the “Draft Electricity (promoting renewable energy through Green Energy Open Access) Rules, 2021”.

About:

  • These rules are proposed for purchase and consumption of green energy including the energy from Waste-to-Energy plants.
  • The draft rules have the following subheads within which details are provided: Renewable Purchase Obligation (RPO); Green energy open access; Nodal Agencies; Procedure for grant of green energy open access; banking; and cross subsidy surcharge.
  • The Tariff for the Green Energy shall be determined by the Appropriate Commission, which may comprise of the average pooled power purchase cost of the renewable energy, cross-subsidy charges (if any) and service charges covering all prudent cost of the distribution licensee for providing the green energy.”
  • The draft rules state “Green hydrogen” is the hydrogen produced using electricity from the renewable sources. The obligated entity including the Industries can also meet their Renewable Purchase Obligation by purchasing green hydrogen.
  • The quantum of green hydrogen would be computed by considering the equivalence to the Green hydrogen produced from one MWh of electricity from the renewable sources or its multiple. The norms shall be notified by the Central Commission.
  • The Appropriate Commission shall put in place regulations in accordance with this Rule to provide Green Energy Open Access to consumers who are willing to consume the Green energy. All applications for open access of Green Energy shall be granted within a maximum of 15 days.

CLICK HERE TO DOWNLOAD FULL PDF

CLICK HERE TO DOWNLOAD UPSC E-BOOKS

Study Material for UPSC General Studies Pre Cum Mains

Get The Gist 1 Year Subscription Online

Click Here to Download More Free Sample Material

<<Go Back To Main Page

Courtesy: PIB