(THE GIST OF PIB) Next Generation Launch Vehicle
(THE GIST OF PIB) Next Generation Launch Vehicle
(SEPTEMBER-2024)
Next Generation Launch Vehicle
Recently, the Union Cabinet chaired by the Prime Minister of India has approved the development of Next Generation Launch Vehicle (NGLV).
About Next Generation Launch Vehicle:
-
It will have 3 times the present payload capability with 1.5 times the cost compared to LVM3, and will also have reusability resulting in low-cost access to space and modular green propulsion systems.
-
The development of the NGLV is taken up which is designed to have a maximum payload capability of 30 tonnes to Low Earth Orbit, which also has a reusable first stage.
-
This development project will be implemented with maximal participation from the Indian industry, which is also expected to invest in the manufacturing capacity at the outset itself, thereby allowing a seamless transition to the operational phase subsequent to the development.
-
NGLV will be demonstrated with three development flights (D1, D2 & D3) with a target of 96 months (8 years) for the completion of the development phase.
-
The total fund approved is Rs. 8240.00 Crore and includes the development costs, three developmental flights, essential facility establishment, Programme Management and Launch Campaign.
Significance
-
It will enable national & commercial missions including launch of human spaceflight missions to Bharatiya Antariksh Station.
-
Lunar/inter-planetary exploration missions along with communication & earth observation satellite constellations to Low Earth Orbit that will benefit the entire space ecosystem in the country.
-
This project will boost the Indian space ecosystem in terms of capability and capacity.
CLICK HERE TO DOWNLOAD FULL PDF
CLICK HERE TO DOWNLOAD UPSC E-BOOKS
Study Material for UPSC General Studies Pre Cum Mains
Get The Gist 1 Year Subscription Online
Click Here to Download More Free Sample Material
<<Go Back To Main Page
Courtesy: PIB